1000 L Agitated Tahini Mixing Tank

ArdeAfzal (Dezful) needed a 1000 L tank to mix tahini, a very thick sesame paste: I designed it from concept to six fabrication drawings, and the FEA caught a weak keyway corner on the drive shaft before release. The shell has a 3.74× elastic buckling margin under a full-vacuum fault; the work covers concept selection, detail design, FEA and a manufacturability review.

Project
R&D mechanical design & simulation internship
Company
ArdeAfzal, Dezful
My role
Requirements, concept selection, CAD, FEA and fabrication drawings
Tools
Siemens NX, NX Nastran, ANSYS Mechanical
Method
Systematic design + FEA-verified sizing
Render of the stainless-steel mixing tank: cylindrical shell with a bolted lid, cone bottom and a four-leg support frame with a mid-height ring
Final vessel assembly: shell, lid, agitator, drive shaft and support frame (Siemens NX).
  • 1013.7Lworking volume, against a 1000 L ± 5% target
  • 1.17governing factor of safety: drive shaft, after the keyway fillet fix the FEA found
  • 3.74×elastic buckling margin of the shell under a full-vacuum fault (linear FEA)
  • 6drawing sheets released for fabrication, 5 parts in 316L

Skills shown

  • Non-Newtonian Process Design (Metzner–Otto)
  • Pressure Vessel Design (EN 13445)
  • Finite Element Analysis (ANSYS Mechanical)
  • GD&T & Tolerance Stack-Up (ISO 1101)
  • Material Selection (Ashby Index + QFD)
  • AHP Decision Analysis
  • Concept Selection & Risk Register (FMEA-style)
  • Hygienic / EHEDG Design
  • CAD (Siemens NX & NX Nastran)
  • DFM / Manufacturability Review
  • Technical Reporting

How I did it

Take a 1000 L batch vessel for a highly viscous, shear-thinning food paste from a functional requirements table through concept selection, detail design and independent finite element verification, sized and checked against process, structural, hygienic and safety requirements rather than drawn to a target volume alone.

  1. Batch working volume 1000 L ± 5%; agitator concept selected and verified for full-vessel turnover on a ≈60 Pa·s shear-thinning paste, with no stagnant zones.
  2. Product-contact construction meets EN 1672-2 / EHEDG hygienic design: Ra ≤ 0.8 µm finish, ≥ 3 mm internal corner radii, and a checked CIP spray-coverage argument.
  3. Shell, lid and drive shaft sized for internal pressure, external-pressure (vacuum) upset, bending, deflection and critical speed, with every governing check independently FEA-verified.
  4. Support frame carries the full filled weight (1763.6 kg) to the floor with a checked tip-over margin and a sized floor-anchor detail.
  5. Full GD&T datum scheme and tolerance stack-up across all five parts, closing the loop from the shell bore to the agitator’s 5 mm running clearance.
  1. The assembly

    Siemens NX · five parts in 316L stainless

    Five stainless-steel parts, each independently modeled, sized and toleranced, that come together as one vessel: the lid bolts to the shell through a gasketed 36-bolt joint, the shaft carries the agitator on two bearings and a double mechanical seal, and the whole assembly rests on a four-leg support frame.

    The development of this assembly follows a structured engineering design process: Problem Definition and Requirements, Conceptual Design, Embodiment Design, Material Selection, Engineering Sizing and Design Basis, Detailed Design of the four individual components (including complete dimensioning and engineering calculations), FEA Verification, Manufacturability Assessment, GD&T and Tolerance Stack-Up Analysis, and Assembly and Close-Out. The sections that follow document each stage in turn.

    Major parts
    5, each independently detailed
    Total filled weight
    1763.6 kg (vessel + agitator + product)
    Dry assembly mass
    423.2 kg, 5 parts in 316L
    Drawing package
    6 sheets, released for fabrication
    Assembly drawing of the tahini tank with balloons, exploded part views and the bill of materials: assembly, lid, shell, agitator, shaft and support, all stainless steel
    Tahini tank assembly, sheet 1 of 6: assembly drawing and bill of materials, as released. Select to enlarge.
  2. Functional requirements

    Functional decomposition · weighted requirements table

    Before any part was sized or modeled, the vessel’s shape, arrangement and material were decided and justified in writing: a functional decomposition and requirements table, a weighted concept-selection matrix stress-tested by sensitivity analysis, an embodiment freeze with six traceable decisions, an independent structural cross-check, and a two-stage material selection. Detail Design and the finite element verification that follow sized, modeled and checked what this stage decided.

    Functional block diagram: receive product, contain, agitate and homogenize, transfer out, with thermal control, clean-in-place, venting and the structural load path to the foundation
    Functional block diagram: material flow, auxiliary material/energy flow, control flow, and the structural load path to the foundation. Select to enlarge.
    The six weight-5 must requirements
    RequirementMeasurable objectiveWt
    Batch working volume1000 L ± 5%5
    Mixing uniformityVisually uniform paste; no unmixed pockets at wall, cone bottom or behind the scraper5
    Vacuum containmentShell/cone survive full vacuum (CIP drain-down, blocked vent) with a stated margin5
    Product-contact surface finishRa ≤ 0.8 µm on all wetted surfaces5
    Crevice-free constructionInternal corner/weld radii ≥ 3 mm; no exposed threads in the product zone5
    Overpressure/vacuum protectionRelief device(s) sized and set (vacuum breaker ≈ −0.05 barg)5

    17 requirements decomposed in total across five weight tiers (2 to 5); the six weight-5 “must” requirements are shown.

  3. Conceptual design: concept selection

    Weighted decision matrix + sensitivity analysis

    Three agitator concepts were generated, screened for feasibility, and scored against the weighted requirements table above using a weighted decision matrix.

    A single weighted matrix is not treated as sufficient justification on its own: the weights were perturbed twice, in two different directions, to test whether Concept A’s lead would survive a reasonable engineer disagreeing with the baseline weighting. Concept A wins the baseline matrix and a mixing-performance-weighted variant decisively, and only loses in a variant that requires suppressing two need-linked criteria below a defensible floor. Concept A, the anchor-and-scraper agitator, is confirmed for Detail Design.

    Weighted decision matrix, baseline weighting
    Agitator conceptWeighted score
    Concept A, anchor + scraper (selected)4.11
    Concept C, gate/paddle3.70
    Concept B, helical ribbon3.01
  4. Embodiment design: arrangement freeze

    Embodiment design

    Embodiment Design freezes the physical arrangement, the topology of how the major components are positioned and connected, that Detail Design then sizes, models and simulates. Six decisions are frozen as the baseline; reopening any of them in Detail Design requires a documented reason, not a silent redraw.

    1. Drive & shaft support: top-entry gearmotor; two-bearing shaft (upper pillow block + lower guide bearing at the product line).
    2. Shaft seal: double mechanical seal, EHEDG hygienic class, at the cover penetration.
    3. CIP / spray layout: single top-mounted spray ball; wall-coverage argument accepted, arm/blade-surface coverage carried forward as an open item.
    4. Vent / breather: 0.2 µm hygienic filter, cover-mounted, isolated from the spray path.
    5. Jacket / gearbox / motor: simplified envelope volumes, no internal detail.
    6. Support frame: four-leg welded tube frame, ring-borne, leveling feet; bracing finalized as a mid-span ring during Detail Design.
    Preliminary arrangement sketch: gearmotor on top, drive shaft through the lid with bearing and seal, vessel shell with cone bottom and lettered callouts for each component
    Full preliminary arrangement, embodiment freeze. Select to enlarge.
  5. Material selection

    Ashby-style indices + QFD scoring

    Material selection was applied independently to the three components whose governing failure mode differs: the shell (external-pressure buckling), the shaft (torsion/bending strength), and the agitator blades (bending strength, wear-exposed). Stage 1 derives an Ashby-style index directly from each component’s governing physics; Stage 2 weighs the Stage-1 survivors against the project’s own weighted requirements using a QFD-style scoring method.

    Shell:  M = E1/3/ρ
    Shaft:  M = τf2/3/ρ
    Blades: M = σf2/3/ρ

    Corrosion resistance is enforced as a non-compensatory hard screen before Stage 2 scoring: a minimum PREN ≥ 23 is required regardless of how well a candidate scores elsewhere. 304 stainless (PREN 18) does not clear this threshold and is eliminated; 316L (PREN 24) and 2205 duplex (PREN 35) both proceed to Stage 2 scoring.

    Duplex’s real structural advantage is small at the shell (≈3.7%, since buckling is a stiffness-governed mode where the two alloys are close) and not needed at the shaft or blades, where 316L already carries comfortable margin. 316L is selected throughout the product-wetted train; a 2205 duplex or hardfaced scraper edge is flagged as the most defensible upgrade path if wear, not strength, becomes the limiting factor in service.

    Stage 2 result: selected material by component
    ComponentSelected materialQFD4MAT final score
    Shell316L3.176 vs. 2.824 (2205 duplex)
    Shaft316L3.248 vs. 2.752 (2205 duplex)
    Agitator blades316L, optional wear treatment at the scraper edge3.248 vs. 2.752 (2205 duplex)
  6. Design-basis sizing

    Single source of truth for the governing numbers

    Single source of truth for the governing sizing results: the numbers Detail Design built from and the finite element verification below checked. Engineering sizing turns the decisions of steps 3 to 5 into governing numbers.

    Design-basis sizing results
    QuantityGoverning valueBasis / margin
    Working volume1013.7 Lvs. 1000 L ± 5% target, met
    Agitator power / motor4.06 kW calc. / 7.5 kW installed≈85% margin, covering rheology uncertainty
    Gear ratio58:11450 rpm motor → 25 rpm agitator output
    Shaft diameterØ90 mm (revised from Ø80 mm)FS 1.29 hand-calc / 1.17 FEA, torsion + keyway, governing
    Shell wall thickness4 mmFEA FS 3.74× vs. full-vacuum fault (cylinder governs, not the cone)
    Agitator arm section100 × 25 mm flat barFS 1.99 at the root fillet (FEA)
    Support-frame legs40×40×3 mm SHS, 4 offFS 44.9× Euler buckling; FS 1.12× base friction (as-built)
    Total filled mass1763.6 kgNX-reported component masses + 1000 L product at 1200 kg/m³
  7. Final drawings

    Six-sheet package released for fabrication

    The drawings below carry each part’s final dimensions together with the datum scheme, feature control frames and general tolerances developed in the manufacturability, GD&T and tolerance analysis, released as a six-sheet package. Sheet 1, the assembly drawing and bill of materials, is shown in step 1.

    Lid part drawing: domed lid with nozzle positions, bolt circle, sections A-A and B-B and an isometric view
    Lid part, sheet 2 of 6. Select to enlarge.
    Shell part drawing: cylindrical shell with cone bottom, flange bolt pattern, sections and an isometric view
    Shell part, sheet 3 of 6. Select to enlarge.
    Agitator part drawing: anchor agitator with hub, arms and scraper blades, dimensioned front and side views
    Agitator part, sheet 4 of 6. Select to enlarge.
    Shaft part drawing: drive shaft with keyway details, sections and an isometric view
    Shaft part, sheet 5 of 6. Select to enlarge.
    Support part drawing: four-leg support frame with rings, sections and details
    Support part, sheet 6 of 6. Select to enlarge.

How I checked the results

Every governing hand calculation was independently re-verified by finite element analysis. Three results changed the released design; the rest confirmed it, several with a wider margin than the hand calculation itself predicted.

3/4

FEA studies that changed the released design, out of four run

Not a formality: the shaft’s finite element model found a real stress-concentration flaw at the drive-end keyway corner (FS ≈ 0.83 at the original geometry) and the variable-radius fillet that fixes it is carried into the released drawing. The tank shell’s buckling analysis overturned the hand calculation’s own expectation: the cylinder, not the cone, governs. And the agitator arm’s hand-calculated margin (FS 2.28) was confirmed adequate at FS 1.99 rather than requiring a thicker root.

Governing safety factor by verification check

Factor of safety (FS) at the governing failure mode, hand-calculated then FEA-verified. Hover a bar for detail.

Factors of safety: support-frame base friction as built 1.12 and drive shaft torsion plus keyway corner 1.17, both tight margins below 1.5; agitator arm root fillet 1.99; tank shell full-vacuum fault 3.74; girth-weld junction discontinuity stress 16.7.
Function-level verification results
Function verifiedResultStatus
Contain product: internal + external pressureFEA FS 3.74× vs. full vacuumVerified
Agitate & homogenize: shaft + agitatorFEA FS 1.17–1.99 across governing checksVerified, tight margin
Support & transmit loads: frameTip-over FS 10.5×; base friction FS 1.12×Verified, tight margin
Clean-in-place: spray coverage≈94% estimated wall coverage (analytical)Pending physical validation
Vent / overpressure protectionBreaker set point cross-checked vs. FEAVerified

Finite element verification

Four studies, each modeling the real geometry, fillets, keyways and all, rather than the idealized sections the hand calculations use, and each converged and mesh-checked before its result was accepted. The full write-up of each study is in the technical details.

Von Mises stress contour at the drive-end keyway corner of the shaft after the fillet redesign, 145.27 MPa maximum
Drive shaft. After the fillet redesign: 145.27 MPa peak (FS ≈ 1.17), down from ≈205 MPa at the original geometry. Select to enlarge.
Von Mises stress along the agitator arm, highest at the root next to the hub weld and decaying toward the tip
Agitator arm. Von Mises stress along the arm: 85.6 MPa peak at the root, decaying to the tip. Select to enlarge.
First eigenvalue buckling mode of the tank shell: five-lobe circumferential wave in the cylinder, cone undeformed
Tank shell. Governing buckling mode: a five-lobe wave in the cylinder; the cone does not participate. Select to enlarge.
Wedge-sector model of the cone-to-cylinder junction, Von Mises stress highest at the junction kink
Girth-weld junction. Wedge-sector model: stress concentrated near the junction kink, decaying into each shell. Select to enlarge.

Project close-out

Checked three ways: sub-function by sub-function, risk by risk, and requirement by requirement. The three close-out tables are in the technical details.

6 / 7sub-functions built and verified; clean-in-place validation pending9 / 9product risks mitigated9 / 13requirements met, 4 partially met

Engineering judgment and recommendations

Beyond the pass/fail results, the verification campaign surfaces where the design has room and where it genuinely does not.

  • Flagged

    Watch the support-frame’s base-friction margin (1.12×)

    With the frame’s four feet simply resting on the floor, only friction resists the legs’ outward splay thrust, and a food-processing floor exposed to sesame-oil residue is a realistic case for a lower coefficient than the conservative 0.30 already assumed. The frame’s four pre-drilled floor-anchor holes are provided for exactly this; fitting the recommended M10 wedge anchors raises the margin to 5.5×+ and should be treated as a required installation step, not an option.

  • FEA changed the released design, not just confirmed it

    The shaft’s keyway-corner redesign, the shell’s corrected buckling-governing location, and the agitator arm’s confirmed-adequate root section are three independent, real findings, evidence that the verification campaign was doing genuine engineering work rather than a formality bolted on at the end.

  • The rheology assumption is the single largest open item

    The tahini’s shear-thinning parameters (n ≈ 0.4, K ≈ 150 Pa·sn) are literature-representative values, not a measurement on the actual product, which is why a 50% design margin is carried through the motor sizing. A rheometer run on the real product, ahead of any scale-up, would replace that buffer with a verified number.

  • A full code calculation would close the last gap to certification

    The shell’s external-pressure case is currently closed by an FEA eigenvalue result, not the full EN 13445-3 clause 8 code calculation named as the alternative path. Running it as an independent cross-check would close the gap between this pilot’s screening methodology and a certified design.

Technical details

The structural-configuration study, the method, the full FEA write-ups and the close-out tables, for engineers who want to go deeper.

Structural configuration justification Per-part morphological screen and AHP grading of the bottom shape and support frame

Morphological screen + Analytic Hierarchy Process (AHP)

The structural configuration was selected and frozen using a weighted matrix and a qualitative arrangement freeze. This step re-examines it at a finer grain, part by part, using a two-level method: a per-part morphological screen and, where two or more variants survive, an independent Analytic Hierarchy Process (AHP) grading.

Only the bottom shape and the support-frame type had genuine multi-way competition; every combination of their surviving variants was checked for part-to-part compatibility before scoring, not a chosen subset. The cone bottom plus four-leg frame combination ranks first, ahead of the runner-up (cone plus three-leg) by roughly 15%, confirming independently the same configuration already selected in step 3 and frozen in step 4.

Structural parts screening-decisive
5 / 7, one surviving variant each
Full-structure combinations checked
9 (3 bottom shapes × 3 frame types)
AHP consistency ratio
CR < 0.10 on every matrix
Method Metzner–Otto rheology chain, modeling approach, design codes and purchased components

Metzner–Otto correlation · Siemens NX · ANSYS Mechanical · NX Nastran

Tahini behaves as a shear-thinning (pseudoplastic) paste: its apparent viscosity depends on the shear rate the agitator itself generates, a circular problem that the Metzner–Otto correlation resolves by treating the impeller as generating one characteristic shear rate proportional to its speed.

γ = ks·N → μapp = K·γn−1 → Re = ρND²/μapp → Po = Kp/Re → P = Po·ρN³D⁵

  • All CAD modeling and drafting carried out in Siemens NX; structural and modal simulation in ANSYS Mechanical, cross-checked against Siemens NX Nastran.
  • Every governing hand calculation, covering torque, bending, buckling and discontinuity stress, was independently re-verified by finite element analysis before being signed off.
  • Each part is modeled in NX using construction logic that mirrors its actual fabrication: the shell and lid as single Revolve features from one connected sketch profile, nozzles and bolt holes as Pattern Features rather than repeated sketches, and the support-frame rings as a Revolve of the legs’ own SHS cross-section.
  • The drive shaft is checked against four independent failure modes at its governing sections: torsion and keyway stress concentration, combined bending and torsion, deflection and critical (whirling) speed, and fatigue under the Modified Goodman criterion.
  • Design basis: EN 13445-3 (pressure vessels), EN 1672-2 / EHEDG (hygienic design), ISO 1101 (GD&T), ISO 21940-11 (rotor balance).
  • Purchased components (bearings, mechanical seal, coupling and gearmotor) are sized by their calculated interface loads and dimensions, then checked against real catalog references (SKF, John Crane, KTR, SEW-Eurodrive) as a starting point, not a final selection.
Finite element verification: full write-ups Requirement, governing equation and result for each of the four studies

The result plots for each study are shown under “How I checked the results”.

01. Drive shaft: torsion, bending & critical speed

Requirement

Survive the full motor-rated design torque (2722 N·m, a 1.76× overload factor over the process duty) at a keyed cross-section, stay within the 5 mm running clearance under the agitator’s bending load, and keep the critical (whirling) speed at a large margin over the 25 rpm operating speed.

FS = τallow / τ(Tdesign)keyway stress concentration Kt = 1.6

FS 1.17governing (FEA)619×critical-speed margin

The hand calculation (FS 1.29) missed a real 3D effect: the FE model found the true peak stress at the open end of the drive-end keyway (FS ≈ 0.83 at the original geometry, predicting local yielding). A variable-radius fillet, holding the DIN-constrained 0.4 mm along the keyway root and tapering to a larger radius at the open corner, resolved it to FS ≈ 1.17, and was carried into the released drawing.

02. Agitator arm: root bending at the hub weld

Requirement

The anchor arm’s root (hand-calculated FS 2.28, idealized as an untapered flat bar) needed FEA confirmation before accepting the as-designed section without a thicker or tapered root.

FS = σy / σ(root fillet, FEA)

FS 1.99root fillet (FEA)2.70×tip-clearance margin

A symmetry model of the hub-and-arm weld, loaded with a drag pressure calibrated to the same root moment as the hand calculation, confirms the untapered 100×25 mm arm section: no redesign required. The fillet’s modest stress concentration (Kt ≈ 1.15) explains the 15% gap to the hand calculation’s uniform-section estimate.

03. Tank shell: external-pressure (vacuum) buckling

Requirement

The 4 mm shell wall is sized against a vent-limited vacuum event, not an unmitigated full vacuum. The classical hand-calculation screen had flagged the cone, not the cylinder, as the weak point, with a margin below the vacuum breaker’s own set point. This called for a full eigenvalue buckling analysis of the real geometry.

[KE + λ·KG(σref)]{φ} = 0linear eigenvalue buckling

379 kPacritical pressure (FEA)3.74×FS vs. full vacuum

Contrary to the hand calculation’s own expectation, the governing mode is a five-lobe circumferential wave confined to the cylinder, and the cone shows essentially zero participation. Its continuously decreasing radius makes it intrinsically more buckling-resistant than the flat effective-cylinder approximation used for screening suggested; the hand-calc bound is confirmed conservative, not a close call the FEA happened to clear. Because a linear eigenvalue analysis assumes a perfect shell, 3.74× is an elastic margin: weld seams and out-of-roundness lower the real buckling pressure, which is why design codes reduce such results with an imperfection knock-down factor. Even a conservative factor of 0.5 would still leave about 1.9× against full vacuum.

04. Girth-weld junction: discontinuity stress

Requirement

The cone-to-cylinder junction has a 58.8° half-angle, well past the 30° above which design rules such as ASME VIII-1 call for either a knuckle or a dedicated analysis of the junction. This design has no knuckle, so an axisymmetric wedge-sector model provides that analysis: it quantifies the local bending stress the junction’s sharp geometry produces under internal pressure.

H = N1·tan(α)  →  σb = 6Mmax/t²shell discontinuity theory

10.2 MPapeak discontinuity stress (FEA)16.7×FS vs. yield

Note: the 48 MPa maximum in the stress plot sits exactly on the sharp corner of the junction, a geometric singularity where the FEA stress keeps rising as the mesh is refined. It is therefore not used as the design stress; the 10.2 MPa peak discontinuity stress above is the representative value. Even taken at face value, 48 MPa would still leave a factor of safety of about 3.5 against yield.

The representative FEA peak of 10.2 MPa is more than five times lower than the conservative hand-calculation screen (56.7 MPa). The symmetric edge-shear-split approximation the hand method relies on is a poor fit for this vessel’s unusually steep half-angle. No knuckle radius or thickness increase is required on structural grounds.

Functional check The functional decomposition from step 2, closed out: each sub-function checked against what was actually designed, sized and verified.
Functional check: sub-functions, what was built and verified, and status
Sub-functionBuilt & verifiedStatus
Receive / charge productEntrance nozzle sized and located on the lid (Ø60/Ø70 mm)Built as planned
Contain productInternal-pressure FS ≈15×; external-vacuum case FEA-confirmed FS 3.74×, with the cylinder, not the cone, governingVerified, FEA corrected the governing location
Agitate & homogenizeShaft FE-verified across two load cases plus modal; arm FE-verified at FS ≈1.99Built and verified
Transfer product outDrain nozzle sized on the cone (Ø50/Ø60 mm)Built as planned
Clean-in-placeTop-mounted static spray ball, ≈94% estimated wall coverage; moving-surface coverage still openDesigned, validation pending
Vent / breathe0.2 µm hygienic vent filter; vacuum-breaker set point cross-checked against the FEA buckling marginBuilt and verified
Support & transmit loadsLeg buckling FS ≈44.9×, tip-over FS 10.5×; as-built friction margin thin at FS 1.12×; M10 wedge anchors raise the margin to 5.5×Verified, anchor upgrade recommended
Risk register: final disposition The nine product risks scored at concept selection (step 3), closed out: what actually mitigated each one across Detail Design, FEA and Manufacturability.
Risk register: risks, evidence and final disposition
RiskEvidenceDisposition
Shaft bending/whirling unverifiedFE-confirmed FS 1.17–1.97; critical-speed margin 619×, after a fillet fix the FEA itself foundMitigated by design
Shell vacuum bucklingFEA FS 3.74× vs. full vacuum; cylinder governs, not the cone the hand-calc flaggedMitigated by design
Hygienic design detail unspecifiedCorner/weld radii and surface-finish requirements verified compliantMitigated by design
Agitator torque overload at startup1.76× torque overload factor built into the shaft/motor sizingMitigated by design
Mechanical seal leakageDouble mechanical seal specified, EHEDG-hygienic class, with a 0.02 mm total-runout GD&T requirementMitigated by component selection
Weld/crevice contaminationWeld-quality and fillet/weld-toe radius requirements verified compliantMitigated by design
Frame instability / under-sized anchoringLeg buckling FS ≈44.9×, tip-over FS 10.5×Mitigated by design
Tolerance stack-up interference at the wall clearanceEvery governing chain (bolt circle, nozzle position, overall height, keyway fit and wall clearance) checked and passesMitigated by design
Agitator imbalance vs. ISO gradeCalculated eccentricity ≈7% of the ISO G6.3 permissible budgetMitigated by design
Requirements checklist The specification table from step 2, checked item by item against final status at project close-out.
Requirements checklist: requirement, basis and status
RequirementBasisStatus
Batch working volume 1000 L ± 5%Sized to 1013.7 L, +1.37%, within bandMet
Mixing uniformity, no unmixed pocketsAnchor+scraper selected for full-vessel turnover; uniformity itself needs a commissioning trialPartially met
Vacuum containment, stated marginFEA-confirmed FS 3.74× against full vacuumMet
Internal pressure allowanceHand-calculated FS ≈15× against the stated excursion caseMet
Shaft/seal dynamic runout ≤ allowable0.02 mm runout specified and flowed into GD&T; not yet checked against a named seal’s actual limitPartially met
Agitator balance to ISO 21940-11 gradeGrade G6.3 analytically confirmed with large margin; physical balance check not yet performedMet, pending confirmation
Structural design life ≥10 yearsShaft fatigue FS ≈11.6× confirmed; the agitator arm’s cyclic stress is a stated limitation, not fully quantifiedPartially met
Support-frame stability, no uplift/tipTip-over FS 10.5×, leg buckling FS ≈44.9×; as-built base-friction margin thin at FS 1.12×; M10 wedge anchors raise the margin to 5.5×Met, with a caveat
Surface finish Ra ≤0.8 µmSpecified and verified compliantMet
Crevice-free construction, radii ≥3 mmR3–R5 minimum radii specified and verified compliantMet
CIP cleanability, validated spray coverageSelf-drain slope ≈33° exceeds the 3° minimum; spray coverage ≈94% estimated, full validation deferredPartially met
Vent filtration, 0.2 µm filterSpecified on the ventMet
Overpressure/vacuum protectionVacuum-breaker set point specified and confirmed against the FEA buckling marginMet